PRODUCT: TIMBALOK RETAINING WALL SYSTEM

MAIN CONTRACTOR: WILLMOTT DIXON CONSTRUCTION

PROJECT: LLWYNDERW PRIMARY SCHOOL, SWANSEA

WALL HEIGHT: UP TO 3M

DETAILS: - TIMBALOK WAS USED TO RETAIN A RAMPED PEDESTRIAN WALKWAY AND CARPARK ALONG THE BOUNDARY OF A NEW ALL WELSH SPEAKING PRIMARY SCHOOL IN SWANSEA.

THE CONTRACTOR REQUIRED A RETAINING WALL SYSTEM WHICH WAS NOT ONLY COST EFFECTIVE BUT COULD BE CURVED, ACCEPT RAPID CHANGES IN GROUND LEVEL, A SURCHARGE LOADING OF UP TO 10KN/M² IN THE CARPARK AND COULD BLEND INTO THE SURROUNDING LANDSCAPED AREA CONTAINING MANY MATURE TREES AND SHRUBS.

TIMBALOK TICKED ALL THE BOXES AND WAS CONSTRUCTED ON TIME AND WITHIN BUDGET.

To download the full details - click here

 

PRODUCT: TIMBALOK RETAINING WALL SYSTEM

EMPLOYER: PERSIMMON HOMES

MAIN CONTRACTOR: CUDDY GROUP

PROJECT: FORMER PANTEG STEELWORKS

WALL HEIGHT : 7M

DETAILS: - RPC CONTRACTS HAVE RECENTLY CONTRUCTED PHASE 2 OF THE DESIGN, SUPPLY AND CONSTRUCTION OF A TIMBALOK RETAINING WALL AT THE FORMER PANTEG STEELWORKS, PONTYPOOL FOR PERSIMMON HOMES. THE EXCLUSIVE HOUSING DEVELOPMENT REQUIRED AN EXTENSIVE RETAINING WALL SOLUTION AT 260M LONG AND UP TO 7M IN HEIGHT.
TIMBALOK WAS CHOSEN FOR ITS COST EFFECTIVENESS, SPEED OF BUILD, AESTHICALLY PLEASING ATTRIBUTES AND TOGETHER WITH ITS DESIGN LIFE OF 60 YEARS MAKE IT THE IDEAL CHOICE FOR HOUSE BUILDERS. TIMBALOK IS MANUFACTURED FROM STRESS GRADED EUROPEAN TIMBER FROM MANAGED SUSTAINABLE FORESTS AND IS FSC CERTIFIED, COMPLEMENTING RPC’S OWN COMMITTMENT TO THE ENVIRONMENT.
RPC CONTRACTS WERE EMPLOYED BY THE CUDDY GROUP TO CARRY OUT THE DESIGN, SUPPLY AND INSTALLATION. THE CHALLENGING SITE CONDITIONS CALLED FOR RPC AND CUDDY TO WORK CLOSELY TOGETHER TO ENSURE THE STRINGENT BUILD PROGRAMME WAS ADHERED TO.

To download the full details - click here

 

CLIENT: HIGHWAYS

MAIN CONTRACTOR: COSTAIN

CONSULTANT: HALCROW

CONTRACT VALUE : £255,000.00

m6 m42

DETAILS: -

THE CLIENT REQUIRED A RETAINING WALL SYSTEM THAT WOULD NOT ONLY MEET THE STRINGENT DESIGN, QUALITY AND LIFE EXPECTANCY DEMANDED FOR HIGHWAYS, IT ALSO HAD TO BE SPEEDY TO INSTALL, FLEXIBLE IN DESIGN AND CONSTRUCTION TO ENABLE ALTERNATIONS TO BE MADE RAPIDLY TO MEET THE CHANGES IN GROUND CONDITIONS THAT WOULD BE ENCOUNTERED WITHOUT DISRUPTION TO THE SUPPLY CHAIN AND INSTALLATION.

RPC’S KRIBLOK WAS SPECIFIED BECAUSE OF ITS ABILITY TO MEET ALL CRITERIA BECAUSE:

DESIGN CAN BE CONSTANTLY UPDATED TO SUIT VARIABLE GROUND CONDITIONS

2. ALL COMPONENTS ARE MANUFACTURED BY RPC AND ARE HELD IN STOCK

3. RPC’S TEAM OF QUALIFIED AND EXPERINCED INSTALLERS

To download the full details - click here

 

CLIENT: - FOCUS
CONTRACTORS:- WALTERS UK LTD
SUPERVISION: - HBG
PRODUCT: - KRIBLOK
QUANTITY: - 3000m²
CONSTRUCTION PERIOD : - 12 WEEKS
CONTRACT VALUE- £435,000.00

blackwood

DETAILS: -

THE DEVELOPMENT OF A NEW SUPER-SIZE DIY RETAIL STORE FOR THE FOCUS GROUP REQUIRED AN EXTENSIVE CUT AND FILL EXERCISE. THIS RESULTED IN THE NEED FOR AN EARTH RETAINING STRUCTURE WHICH WAS CAPABLE OF RETAINING HEIGHTS OF UP TO 10 METRES, WAS QUICK TO BUILD, REQUIRED NO SPECIAL GROUND PREPARATION AND COULD ALLOW A VARIETY OF AS-DUG MATERIAL TO BE RE-USED WITHOUT EXPENSIVE AND DIFFICULT EARTHWORKS TREATMENTS.

RPC CONTRACTS KRIBLOK SENIOR SYSTEM WAS CHOSEN AS IT MET ALL THE SITE REQUIREMENTS WHILE ALSO SATISFYING THE CLIENT’S NEED FOR AN EXTENSIVE DESIGN LIFE (125 YEARS) AND A COST-EFFECTIVE SOLUTION. RPC ‘S IN-HOUSE TEAM DESIGNED THE STRUCTURE AND ITS FOUNDATIONS AND THE INSTALLATION WAS CARRIED OUT AND COMPLETED IN 12 WEEKS BY RPC, INCLUDING THE CONSTRUCTION OF FOUNDATIONS AND ALL THE REQUIRED BACKFILLING

SPECIAL REQUIREMENTS / DETAILS: -

MUCH OF THE WORK WAS CARRIED OUT IN SMALL LENGTHS, TO UNDERPIN THE EARTH EMBANKMENTS AND TO MINIMISE THE RISK OF SLIPPAGE AND REDUCE THE QUANTITY OF TEMPORARY SHEET PILING (INSTALLED BY OTHERS).

To download the full details - click here

 

CLIENT: CONWY COUNTY COUNCIL


CONTRACTOR: MOWLEM CIVIL ENGINEERING

PRODUCT: ROCWALL
QUANTITY: 600M²

conwy quay

DETAILS: -

CONWY COUNCIL WANTED TO EXTEND THE EXISTING HARBOUR FACILITIES AND IMPROVE THE SCOUR PROTECTION TO THE ABUTMENTS OF THE ROAD BRIDGE BY INCREASING THE LENGTH OF THE QUAY WALL. IN ORDER TO OVERCOME THE VERY POOR GROUND CONDITIONS AND SATISFY THE NEED TO WORK IN TIDAL CONDITIONS, THEY ELECTED TO USE A DRIVEN SHEET PILE, WHICH THEY WOULD THEN CLAD. RPC CONTRACTS DESIGNED A PRE-CAST CONCRETE PANEL, FACED WITH NATURAL PITCH FACED, DRESSED LIMESTONE. THE PANELS WERE DESIGNED WITH HOOK FIXINGS, WHICH WERE HUNG ON TO A SERIES OF REINFORCING BARS, WHICH HAD BEEN WELDED TO THE SHEET PILE AFTER INSTALLATION. THE RESULTANT VOID WAS THEN FILLED BY AN IN-SITU GROUT TO FORM A COMPOSITE WALL. THE PANELS WERE DETAILED WITH T & G JOINTING HORIZONTALLY FOR LOCATION PURPOSES, AND SPLAYED ENDS TO ALLOW THEM TO BE INSTALLED TO A RADIUS. THE MAIN CONTRACTOR INSTALLED WATERPROOF JOINTING AS WORK PROCEEDED, INCLUDING STOP-ENDS AT THE END OF EACH SHIFT TO ALLOW THEM TO CARRY OUT THE IN-SITU POUR FOR EACH SECTION BEFORE THE NEXT TIDE. SPECIAL PANELS WERE CAST TO ACCOMMODATE THE STEPS, FLOATING PLATFORM AND THE SLIPWAY.

SPECIAL REQUIREMENTS / DETAILS: -

THE ENVIRONMENT IS AN AGGRESSIVE TIDAL FLOW IN A MARINE ENVIRONMENT. THE PANELS WERE DIMENSIONED TO COORDINATE WITH THE SIZE OF THE DRESSED STONE REQUIRED TO EMPATHISE WITH THE EXISTING ENVIRONMENT AND DESIGNED TO WITHSTAND THE PULL-OUT FORCES OF NOT ONLY THE PANEL TO PILE FIXING BUT ALSO THE SIMILAR ACTION ON THE CAST-IN DRESSED STONE.

To download the full details - click here

 

CLIENT: WREXHAM BOROUGH COUNCIL

MAIN CONTRACTOR:- K M CONSTRUCTION ST ASAPH

wrexham bandstand

DETAILS: -
Occasionally the mundane becomes something rather different.

RPC Contracts were approached to provide a small retaining wall to form the base of a bandstand to which the client was going to attach cladding depicting the Welsh National Anthem in note form.

RPC proposed that we should produce pre-cast walls as finished articles which would include the musical notes in relief, in the concrete face.

Following acceptance of our proposals, RPC had the images of the notes transcribed onto a latex liner which was placed into specially adapted moulds to produce exactly what the client wanted, but at a fraction of the budget.

To download the full details - click here

 

SITE ADDRESS:- BUTTERLY ENGINEERING WORKS, RIPLEY, DERBYSHIRE
CLIENT: - MORRIS HOMES LTD
SUPERVISOR:- MORRIS HOMES LTD
CONTRACTOR:- MORRIS HOMES LTD
PRODUCT: - TIMBALOK
QUANTITY: - 520M²
CONSTRUCTION PERIOD:- 8 WEEKS
retaining wall

PROJECT:- THE CONSTRUCTION OF 146 NO. 2,3,4 BED HOUSES, APARTMENTS AND AFFORDABLE HOUSES INCLUDING ALL THE ASSOCIATED WORKS.

Morris Homes required a solution to retain a bank some 6 metres in height to create car parking bays for apartments above and an aesthetically pleasing structure to look at for the houses below.

Our brief was to design a wall that was almost vertical, be able to accommodate the surcharge loadings from cars/small lorries, be able to withstand the wind loadings from a 2.4 meter high close boarded fence built into the top of the wall and to be able to have the face planted up in the future.

Our solution was to use our TIMBALOK retaining wall. The wall was designed to be built at a 6:1 batter which is only 9º off vertical and thus creating more space for the car parking bays at the top. We incorporated grow-bags within the structure to allow future planting and designed concrete fence post pad bases for the installation of a 2.4 meter high close boarded fence into the top of the wall.


The wall was completed on time and within budget and is just another example of the service, quality workmanship, value for money and problem solving from RPC Contracts

To download the full details - click here

 

PRODUCT: Timbalok Retaining Wall System

CONTRACTORS: Willmott DIXON CONSTRUCTION

PROJECT: WILLIAMSTOWN PRIMARY
SCHOOL, RHONDDA CYNAN TAFF,
SOUTH WALES

WALL HEIGHT: FOOTBALL PITCH
R/WALL - 9.5M, SERVICE YARD
R/WALL 6M

CONTRACT VALUE: £450,000

 

Timbalok Retaining Wall

Client: Gageley Properties

Site Crick: Northamptonshire

Value: £270,000.00

Planta

The site required extensive earth retention to enable the Contractor to maximise
the useable site area while remaining cost effective.

Additionally, the solution had to be attractive and able to blend in with the proposed Landscaping.

RPC Contracts TIMBALOK wall was chosen because it satisfied all the requirements and more.

RPC’s willingness to work with the Main Contractor and their client was foremost in their mind knowing RPC fully understand that difficult sites throw up problems which require a flexible and speedy response while all the time striving to work within the original Budget.

As for aesthetic appearance, well one look at the sinuous curves of one of the TIMBALOK walls at Crick should convince anyone.

  Planta

 

Home Contracts Paving Environmental Contacts

© 2009 RPC Concrete Solutions. All rights reserved. Designed by Delwedd